Sunday, February 26, 2012

Basement Bathroom Update '12

Before - dark, old, very dated basement bathroom.
Demo
Gutted 
New plumbing, drywall, everything.
Painting
Floor and Shower are in!
Vanity and Toilet are in! Almost done!
Finally finished! 

Tuesday, February 21, 2012

35 Days

5 weeks.
35 days.
Kevin has been in Florida missing out on winter.
It is the longest he has been gone since he was in the Air Force.
I missed him.
Allison missed him.
Brindle and Frank missed him.
Puddy, well maybe not so much. He is a cat after all. I did remember to feed him, so he was fine.

Thursday, February 2, 2012

How time flies! (AKA Happy February!)

The days have passed in a blur.
Flu
Frank
Work
Snow

Everything has run together, and I don't know where the time has gone!

Frank now weighs 27 pounds, and he isn't fat, just big! He is only 13 weeks old! Yikes! (look at all these ! can you tell he is big?) And busy? Yes, very busy, he is a 13 week old chocolate lab after all. Sometimes Allison and I wonder what he has in his head? Brains, or Rocks? Did I mention he is a chocolate lab puppy?

Big Footed Frank!
I had the flu, and missed 3 days of school. I'm still coughing, and congested, but hopefully it continues to get better!

Work Work Work what can I say? If I want a pay check, I have to show up. They are funny that way.

Snow, a broken snowblower, two shoves, and an hour and a half of shoveling 7+ inches of the light fluffy snow. A new snowblower, and an additional 3 inches of snow. Thank you God for snowblowers! We would have died if that 7 inches were as heavy and wet as those three! I think we would have died just shoveling those 3. Did I ever tell you we have a really l-o-n-g driveway?

7+ inches of soft blowing snow
 Happy February!